German colocation agency Maincubes has introduced the launch of its second information heart in Frankfurt. The inspiration stone for the brand new FRA02 facility, situated in Schwalbach close to Frankfurt, was laid on June 30, 2022, though development began a yr in the past, experiencing delays as a result of COVID-19.
Additionally Learn: Vantage Knowledge Facilities Set to Broaden Presence With Second Zurich Campus
Maincubes FRA02
Through the basis stone laying ceremony, Maincubes introduced {that a} federal establishment, the Federal Info Know-how Heart (ITZBund), would be the essential person of the constructing.
In a current LinkedIn submit, the corporate made this announcement, saying, “We’re excited to announce that our newest state-of-the-art colocation information heart in Frankfurt, FRA02, is formally LIVE! It is a nice success for Maincubes and marks a milestone in our journey to supply sustainable cutting-edge information heart options in Europe, highlighting our growth. We’re happy to report a easy handover to our consumer.”
Sustainable Options
Based on the corporate web site, the ability provides 7.4 MW of IT capability throughout 4,700 sq. meters of IT white house. FRA02 is powered by inexperienced electrical energy, and the Vitality Effectivity Worth (PUE) is under 1.3.
Maincubes, on the time of the muse laying ceremony, mentioned, “Our declare is to appreciate the absolute best by way of sustainability and, on the similar time, the best security for our computing facilities. This implies planning as effectively as doable, not gifting away rooms, solely constructing what is required. With the green-white and south-facing inexperienced facade, FRA02 will match effectively into the panorama and supply added worth – for digitization and the individuals, corporations, and authorities who use it.”
Additionally Learn: Equinix Inks Photo voltaic PPA With Sembcorp for Singapore Knowledge Facilities
Maincubes FRA04 Announcement
In January 2024, Maincubes introduced that it’s increasing in Frankfurt with a brand new information heart, FRA04. The power is being constructed within the Rhine-Important space, south of Frankfurt in Dietzenbach. The information heart will present round 12,500 sq. meters of whitespace (server room) and 40 MW of IT capability. This would be the largest information heart growth up to now for the corporate and is scheduled to go reside in 2027, in accordance with the official launch.
Photo voltaic PPA
The corporate additionally signed a ten-year Energy Buy Settlement with power supplier Stadtwerke Gottingen AG, with a capability of 34 megawatt peak (MWp) for its third Frankfurt facility, FRA03, earlier this yr in February.